Boarding Out Loft, Adding a Balustrade Rail and Fitting Loft Ladder Dudley, Birmingham

Here is a great example of:

  • Boarding out a loft with 18mm P5 moisture resistant tongue & groove boards.
  • Boarding out using loft legs.
  • Adding safety balustrade rail
  • fitting 3 section aluminium loft ladder
  • fitting upvc hatch

In a new build, 2 bed, terrace house on Cascade Way, Dudley, Birmingham.

This job was a great example of the use of loft legs. Because the house was a new build with 270mm of insulation we put forward the idea of the loft leg system to board out a section of his loft. These loft legs allow you to board out a loft with minimal disturbance to the insulation. This is done by fixing down light weight plastic stilt legs to create a raise platform above the insulation. The owner also wanted a balustrade rail added as a safety feature.

If you would like a quote over the phone, via email or in person please fill in our request a quote form and we'll get straight back to you.