Loft Boarding, Raised Floor, Boarding Over Pipes in Warwick

This boarding job was a great example of how you can board out your loft around and over pipes safely:

  • Boarding out a loft with 18mm P5 moister resistant tongue & groove boards

  • Raising the floor level to accommodate water pipes

  • Raising loft floor level 200mm to accommodate insulation

  • Installing a UPVC loft hatch

  • Fitting a 3 stage aluminium loft ladder

in a 3 bed, semi-detached house on Claypitts Boulevard, Warwick

The couple that owned this property were concerned that they wouldn't be able to use there loft space as there were water pipes running across the ceiling level, We demonstrated how it was possible to raise the level of the loft floor to cover over the pipes safely, including leaving access points at stop taps. We also removed the tongue and groove system from every third board for quick access to any part of there loft, instead of having to pick up the entire floor in the case of an emergency which require access to the pipes. All of our boards are screwed down into place to ensure they are easy to bring back up again if needs be

If you would like a quote over the phone, via email or in person please fill in our request a quote form and we'll get straight back to you.